Archive for October, 2009

Oct 29 2009

Profile Image of arnish
arnish

Faux pas

Filed under Consultation, Windfarms

According to the Press and Journal newspaper, Scotland Office minister Ann Mckechin went flying on the proverbial banana-skin on Tuesday. She spoke in Parliament in Westminster, criticising the rejection by the Scottish Government of the Lewis Windpower Plan for North Lewis. You’ll remember, 180 turbines, each 450 feet tall, stretching the 45 miles from Port of Ness via Bragar to Stornoway. The planning application was turned down as the windfarm violated an area, subject to a European Habitat Directive, which, would have subjected the UK government to very large fines indeed. The Scottish Government was therefore correct in rejecting the application.

It is a pity that our MP did not quote these reasons when replying to the Minister, instead saying that you can’t foist something on people if they don’t want it.

Ms Mckechin stated that the windfarm would have made a large contribution towards the renewable energy targets, set by the UK government. I am fed up to the back teeth with “targets”. The same argument has been bandied about in relation to the Beauly to Denny powerline upgrade, and it appears to be a justification for not following proper procedures in the planning process. The RSPB suspects this also to be the case with regards to the Pentland Road scheme.

I want to make it clear that I am not opposed to windfarms perse - I just prefer to see them offshore rather than onshore.

One response so far

Oct 29 2009

Profile Image of arnish
arnish

St Kilda Centre

Filed under St Kilda

Cliffs at Mangurstadh

Cliffs at Mangurstadh

BBC Highlands & Islands announced this afternoon that the St Kilda Centre is to be sited at Mangurstadh, Uig in the west of Lewis. There were two other sites, Cleitreval (North Uist) and Leverburgh (Harris). There is also to be a St Kilda trail throughout the Outer Hebrides. The remoteness of St Kilda itself, 45 miles west of the Outer Hebrides, makes the siting of the centre in that island unpracticable.

All sites were commended by the working group for putting forward a strong case for themselves, as all 3 sites had great development potential. I am pleased that Mangurstadh, one of the remotest townships in Lewis (40 miles from Stornoway), will be the site of this centre. It will also boost tourism and visitor numbers to the district of Uig.

3 responses so far

Oct 28 2009

Profile Image of arnish
arnish

Windfarms and pylons - II

An update on the two stories I mentioned in my previous two posts.

The approval for the Pentland Road windfarm, 6 turbines near the Achmore junction, has elicited expressions of deep concern from the RSPB. They suggest that the siting of the turbines will adversely affect the golden eagles that live in the area. An environmental impact study, which accompanied the planning application, was described as shoddy, as not conducted in accordance with standards laid down for that type of investigation. The RSPB will now closely scrutinise proceedings and decide on a course of action. As I said last week, a poor exercise in accountability and now, it would appear, an even poorer exercise in planning.

The Beauly to Denny upgrade story from Monday appears to have been a leak, and has blown up into a bit of a storm. One person has alleged that approval for the upgrade was already decided on before the public inquiry was held. I am not at all surprised, bearing in mind the UK government’s policies on renewable energy targets. What surprised me was the assertion that all of Scotland’s energy needs could be met from renewables, without recourse to nuclear (which I don’t much like either) or other technologies, such as clean coal.

What these two items have in common is an arrogant administration, whether it be Comhairle nan Eilean Siar, or the Scottish Government, thinking they are so powerful that they can ride rough-shod over the due planning process, and just making the right noises at the right time, without taking any account whatsoever of public opinion, scientific evidence or legislation.

No responses yet

Oct 26 2009

Profile Image of arnish
arnish

Windfarms and pylons

Beauly to Denny powerline (image courtesy BBC)

Beauly to Denny powerline (image courtesy BBC)

The BBC is reporting that the planned upgrade to the power-line between Beauly (near Inverness) and Denny (near Stirling) is recommended for approval by MSPs. The current line carries 132 kV, which will be increased to 400 kV. The pylons are expected to be 200 feet / 60 metres tall each, and there will be 600 of them along the length of the current powerline. The planning application for this upgrade has been the subject of a public inquiry, the report of which was submitted to Scottish Ministers 8 months ago. The application attracted 18,000 objections.

The upgraded powerline is important for renewable energy projects across the Highlands and Islands, as it will convey electricity, generated by these projects, to users in the Scottish Central Belt and into the UK National Grid.

Objectors have stated that this will irrevocably harm the iconic landscape of the Scottish Highlands, and adversely affect tourism. They also think that alternative options have not been sufficiently explored.

This issue is controversial, and involves high stakes, politically and economically. The Beauly to Denny powerline is part of a policy to cover Scotland’s [sic] energy needs, without recourse to new nuclear powerstations.

The relevance to Lewis is high. As previously reported on this blog, a number of renewable energy projects are in the pipeline for this island, including a 39-turbine windfarm at Eishken, and a smaller 6-turbine project some 5 miles outside Stornoway. Similar schemes have been mooted for North Tolsta, Ballantrushal and the West Side between Shawbost and Dalbeg. Other schemes include a tidal barrage at Shader (although is probably only going to generate electricity for local consumption) and a wave-energy project off Great Bernera. In order to get this power to mainland consumers, a powerline will also have to be constructed between Little Loch Broom (Dundonnell) and Beauly, as well as a subsea cable (referred to as an interconnector).

Should final approval be granted by Scottish ministers (very likely), then we are likely to see the construction of the Eishken Windfarm go ahead at pretty short notice, and the same will apply to the Pentland Road scheme.

This blog has consistently voiced an opinion opposed to large scale windfarms, and in disagreement with the arguments mooted in favour. I do not believe that windfarms will bring long-term, sustained employment to the Isle of Lewis. There will be short-term work in the construction of the windturbines and electricity infrastructure. Once the turbines are in place, only a handful of people will be needed to monitor and operate the windfarm. The community benefits of the Eishken windfarm are spurious, in my opinion, as they require a massive cash injection from said community - and Lochs is not exactly the most affluent area in this part of the world.

The environmental impact will also be substantial, and I would like to take this opportunity to oppose the opinion, voiced in comments on the previous post, that windfarms do not harm eagles. They do. In California, dozens of the raptors are being killed by a massive windfarm in the desert there. I am also restating my assertion that although nobody is entitled to a view, views is what attracts tourism. That being a mainstay of the island makes a shore-based windfarm a good example of a shot in the foot.

Although the final decision rests with Scottish Ministers, I cannot imagine that approval for the powerline upgrade through the Highlands will be taken lying down by its opponents.

7 responses so far

Oct 22 2009

Profile Image of arnish
arnish

Pentland Road windfarm

Filed under Windfarms

Pentland Road

Pentland Road

Not often mentioned on this blog, although very much on the radar for the past couple of years. And I use the word ‘radar’ advisedly. Four times, Comhairle nan Eilean Siar have debated this windfarm, consisting of 6 windturbines off the Pentland Road, some 5 miles west of Stornoway. The Scottish Government had previously called in the planning application, as there were objections from air traffic control bodies. It now appears these difficulties have been overcome, with the advent of improved technology. The other minor difficulty, namely that this area of the island, just south of the Barvas Hills, is a habitat where golden eagles live, appears to have been conveniently overlooked.

Scottish Ministers have indicated the plan no longer requires their final approval, and a one-page sheet of paper, advising approval, has been circulated to councillors. This proposal predates the last Council elections in 2005, and quite a few of the councillors currently in office were not at the time the Pentland Road scheme was first launched. Neither are they, therefore, fully conversant with all the pros and cons of the scheme. None of this material is included on the single A4. Hardly surprising - each time I’m in Stornoway library, I need stilts to step over the mountain of paperwork that is the Eishken planning application, and this one (about 1/6th the size of the Eishken project) can’t be much less.

I don’t think it’s an exemplary exercise in democratic accountability. I do think it is a blatant demonstration of this Council’s rubberstamping policy where shorebased windfarms in the Western Isles are concerned.

Source: Hebrides News

3 responses so far

Oct 20 2009

Profile Image of arnish
arnish

800 years ago

Filed under Education

According to Hebrides News, Comhairle nan Eilean Siar is aiming to have new school premises ready at Tarbert, Stornoway and Balivanich by 1212. If you spot the mistake, all I can say is well done. Hardly anybody spotted it by the look of it. Certainly not the journalists at the Press and Journal newspaper, who do a regular copy and paste job on newsitems from Hebrides News, without rechecking facts themselves. You can see that for yourself.

I rarely have cause to complain about our local and regional news media, but this is a bit of an editorial failure.

5 responses so far

Oct 19 2009

Profile Image of arnish
arnish

Queen Mary II

Filed under Maritime, Tourism

This cruiseliner, the largest passenger vessel afloat, came blasting down the Minch on Sunday afternoon at 20 knots. It is on a round-Britain cruise, in celebration of the 5th anniversary of its launch. The first time I encountered it was in June 2005, when its waves disturbed the placid waters of the Sound of Shiant in thick fog. This time round, it was visible, but at a distance of 12 miles from Stornoway. As I type, the QM2 is docked at Greenock, and will depart for Liverpool later this evening.

Queen Mary II passing down the Minch

Queen Mary II passing down the Minch, as seen from Stornoway

4 responses so far

Oct 17 2009

Profile Image of arnish
arnish

Extended summer service

Filed under Transport

Our MP has asked for the ferry summer timetable to be extended into November. Its current validity runs out next Saturday, October 24th. He states that the slashing of ferry fares, due to RET, has promoted ferry traffic last summer. Mr Macneil appears to be unaware though that the tourist season tends to end at the close of the midterm break, i.e. by the penultimate weekend in October. Five years ago, when I was travelling western Scotland, I could not help but notice that everything ground to a stop by October 24th or thereabouts, and that was not related to the ferry services. Being in the Isle of Skye at the time, which can be reached by bridge, it was very noticeable. Also, the Stornoway to Ullapool ferry service is the same right through the year. Other services in the Western Isles do see a reduction in service though.

However, if the summer service is extended in November and leads to an increase in tourist traffic to the islands, I’ll be the last to complain.

2 responses so far

Oct 09 2009

Profile Image of arnish
arnish

Eigg and chips

Filed under Community, Eigg, Other islands

That is the title of an excellent article on the BBC News website about the island of Eigg, situated about 90 miles south of Stornoway, 15 miles southwest of Mallaig off the coast of western Scotland. The islanders have gone from strength to strength since they gained ownership of Eigg in June 1997. Before that, they had suffered 30 years of maverick landlords who were only interested in the place as a playground or tax dodge. Said lairds were not prepared to make substantial improvements to the island. So, since June 1997, the islanders have done it themselves. In February 2008, they went live with a 24/7 electricity grid, after having to rely on capricious diesel generators for decades. Three windturbines, a handful of hydro-electric schemes, photo-voltaic cells - you name it they have it. And now the Eiggeachs want us all to join in. I can just about see them winning this Big Green Challenge for which they are shortlisted.

I have supported the islanders of Eigg for over a decade. And continue to do so. Go for it, guys!

7 responses so far

Oct 08 2009

Profile Image of arnish
arnish

Fly me to school

After following a link from Fletcher Saga (Stronsay) about inter-island flights in Orkney, my jaw dropped. S1/S2 pupils from Eday are flown to school on Mondays on a dedicated flight. Similarly, itinerant teachers are flown round the islands on dedicated flights as well. Oh well, go to Orkney for unusual air movements…

3 responses so far